Various small scale Civil Engineering works were required at the Coca Cola Spring Water Production Plant in Malvern, Worcestershire.
The contracted works included demolitions, water pipe replacements, road replacements and the provision of a 110,000 litre water storage tank which was sourced, manufactured and transported from Poland.